Msheireb-Station

Msheireb Station Project

Project data

Location: Doha, Qatar

The scope of work comprises a sustainable design construction of an interchange station approximately 40 meters below ground level. The station construction includes cut and cover tunnel sections as well as associated facilities. PERI's solution include the supply of formwork and scaffolding specifically designed for the construction of walls and slabs. Msheireb Station will connect the Gold Line Red Line and Green Line all of which are currently under construction. Once completed this massive flagship station will be the central hub of Doha's public transportation system.

Requirements

Fast, safe and effective solutions from PERI were required for this very important project. 

Customer

SAMSUNG C&T - OHL - QBC JV

Customer's benefit

The high legload capacity of the PD8 frames and ROSETT used as tables to carry the 3m slab thickness proved to be a very reliable system able to carry high loads. This solution from PERI enabled the JV to save time and overall construction cost of the project. 

Carlos Allepuz
Construction Manager

PERI engineers have given us full round-the-clock technical support and reliable after sales service from day one. This close cooperation has enabled SOQ JV to use PERI cutting-edge solutions to build this very important station efficiently, safely and successfully.

PERI solution

- PD8 and ROSETT Tables of approximately 150,000 cubic meters
- VARIO Wall formwork of approximately 8000 sqm
- Column formwork, VARIO and Special round steel shutter of 2000 sqm