Optimized GT 24 Girder Design
One of the key elements of the solution was the use of PERI GT 24 girders.
The engineering design optimized the arrangement of the girders, reducing the overall number required while maintaining the specified fresh concrete pressure of 80 kN/m², in accordance with the client's concrete specification and a concrete rate of rise of 1.0 metre per hour.
This optimized design provided both structural efficiency and practical installation benefits.
Designing for Wind Stability
Due to the exceptional height of the formwork, wind loading became a significant design consideration.
To provide the required stability, push-pull props were installed at four different levels, with two props provided for each panel.
This arrangement enabled the formwork to safely resist the anticipated wind loads while maintaining alignment throughout the concreting process.
Internal Access for Concrete Vibration
Maintaining concrete quality over a wall height of 14.4 metres requires effective compaction.
To facilitate internal vibration, the engineering team incorporated 80 × 80 cm access openings within the formwork system.
This solution allowed operators to perform internal vibration efficiently while eliminating the need for external vibrators, which can significantly increase pressure acting on the formwork.
Safe Lifting and Rotation of Formwork Panels
Another important engineering consideration involved the safe lifting and rotation of the formwork panels from the horizontal to the vertical position.
To improve structural behaviour during lifting operations, PERI increased the number of strongbacks in critical locations.
This reduced the bending moments acting on the SRU walers, improving safety during panel handling and installation.
Engineering Expertise That Supports Complex Concrete Construction
Projects such as this demonstrate how engineering expertise can transform demanding construction requirements into practical solutions.
Rather than relying solely on standard equipment, the PERI Engineering Team developed a solution tailored to the project's specific structural requirements, enabling safe execution while optimizing the formwork design.
From initial engineering calculations through to practical site considerations, every design decision contributed to achieving the project's objective of casting a 14.4m-high reinforced concrete wall in one single pour.
Engineering Solutions for Water Tank Construction
Water tanks, reservoirs, wastewater treatment facilities, and other water infrastructure projects often require customized engineering solutions to meet demanding construction requirements.
PERI supports contractors with:
- Formwork engineering for complex concrete structures
- Customized system design
- Engineering calculations
- Safe lifting concepts
- Technical support throughout project execution
- High-performance formwork and scaffolding systems
By combining engineering expertise with proven formwork technology, PERI helps contractors build safely, efficiently, and with confidence.
Congratulations to the Engineering Team
This achievement reflects the expertise, commitment, and collaboration of everyone involved throughout the engineering and project execution process.
Projects like this demonstrate what can be accomplished when engineering excellence, careful planning, and teamwork come together.
We are PERI.