The PERI UP Rosett modular scaffold allowed optimal adjustment to the complicated building geometry.

Project Overview

Together with our customers we create great things. Whether scaffolding, skyscrapers, bridges or tunnels, we will show you which projects we have realized together with our customers.

All Projects

The construction of a 27 floor commercial tower within the iconic Lusail Marina District development.
A large and sophisticated mix-used development consisting of 4 towers in The Pearl.
Only PERI is able to deliver on the largest projects that require efficient, safe and reliable solutions with a high level of technical support.
Gewan Island
The Barwa Commercial Avenue in the south of Doha extends to a total length of 8 kilometers.
Already during the construction phase, the Al Hamra Tower stood out through its timeless elegance which was achieved by turning the external facade by 130 degrees.
Four Seasons
Bahrain WTC
Bvlgari Hotel & Residences
Strong and reliable support up to 14m high with PERI UP shoring system
One climbing system – two climbing methods: with protection provided by the RCS climbing protection panel, the two twisting Absolute World towers rose steadily upwards in regular weekly cycles.
The American Las Vegas Sands Corporation is the owner of the complex the highly visible hotel towers.
Habtoor Residences project using PERI ACS Automatic Climbing System
PERI world class solutions are used on most of the stadium projects.
Construction of a multi-level tunnel using PERI's state of the art Tunnel Carriage System
On large scale projects such as the Gold Line metro package, PERI's safe, fast, reliable and superior technical support is what truly separates us from our competitors.
E Ring Road
The bridges were an important element as it crossed over the busy Doha Expressway. Therefore, a fast and flexible solution from PERI was required and successfully delivered.
The Msheireb subway station in the heart of Doha has been designed as a major interchange, and features almost 200 m long and 180 m wide imposing structural dimensions.
The large spans in the middle bridge sections were concreted by means of the balanced cantilever method.
With the selected PERI formwork and scaffolding systems, the construction team was able to cost-effectively fulfil all requirements in spite of the tight construction schedule. The solutions developed by PERI engineers and the local site management, along with support provided by PERI specialists, contributed to efficient and problem-free construction.
More than 12 months after starting the development work on the Panama Canal, the dimensions and the massive structural elements are clearly visible.
Zahid Business Park
The variable VARIO girder wall formwork, together with SKS climbing scaffold, formed large area transportable units.
Khor Al Zubair Immersed Tunnel
In the US state of Louisiana, three enormous liquid gas tanks were simultaneously realized using PERI know-how. Each of the structures has an 80 m diameter and a wall height of 44 m.
A huge birdcage scaffold on the basis of PERI UP Rosett provided safe access ways and working areas for subsequent site activities up to a height of nearly 80 m.
Unique structure with no intermediate support
Through the planning and supply of formwork and scaffolding from one source, the MULTIFLEX slab formwork and PERI UP shoring could be perfectly matched.
Easy to mount and move manually
For extending the cement plant, engineers from PERI Ukraine designed a comprehensive and sophisticated formwork and scaffolding solution.
A total of 9 circular piers with 3.60 m diameters and 40 cm wall thicknesses will subsequently carry a steel platform for the condenser.
For the power plant construction in Eemshaven, the industrial scaffold system PERI UP has clearly demonstrated its flexibility and adaptability.
The two-storey supporting structure, with a height of 25 metres, accommodates the sorption installation for the flue gas desulphurisation.
The 2.00 m wide shoring scaffold sections are connected longitudinally by means of heavy-duty spindles and push-pull props to form shoring towers.

Interested in how PERI can support your next project?

Call us on +974 4411 4816 to discuss your requirements further.

Contact us