Construction and Upgradation of Al Rayyan Road
Doha,
Qatar
The project includes the construction and upgradation of Rayyan Road which entails 5.3km of four lanes in each direction separated by a central median in addition to 5.4km of side roads, underpasses and bridges constructed over the busy Doha Expressway.
Dogus Construction - Onur Taahhut JV
Location
-
BenefitsHigh level of technical assistance and engineering support, to cope with any changes of design based on the site situation and requirements
-
BenefitsExperineced on-site supervison assitance from PERI
-
BenefitsCost effecticve solutions from PERI that met with the overall project schedule
The Project
Impressions from the project process
The bridges were an important element as it crossed over the busy Doha Expressway. Therefore, a fast and flexible solution from PERI was required and successfully delivered.
Perfectly match superstructure formwork and shoring solutions.
Easy and fast assembly of PERI shoring systems is a huge advantage of any construction project.
Proven solutions from PERI
Special solutions from PERI to meet any challenge or requirement on-site.
The bridges were an important element as it crossed over the busy Doha Expressway. Therefore, a fast and flexible solution from PERI was required and successfully delivered.
Perfectly match superstructure formwork and shoring solutions.
Easy and fast assembly of PERI shoring systems is a huge advantage of any construction project.
Proven solutions from PERI
Special solutions from PERI to meet any challenge or requirement on-site.
Project Information
Are you working on a project like this?
Call us on +974 4411 4816 to discuss your requirements further.