Subway station in the heart of Doha as lynchpin of the currently under construction state-of-the-art metro system in the capital of Qatar.
Major interchange featuring a toal of four main levels at depths of up to 40 m.
SOQ Joint Venture; Samsung C&T, OHL, QBC and Consolidated Contractors Company (CCC)
Location
-
BenefitsFast construction progress due to the individually adapted system concept and continuous on-site support.
-
BenefitsCost-effective construction execution through just-in-time provision of materials.
-
BenefitsRealization of the ambitious infrastructure project within the tight construction schedule.
The Project
Impressions from the project process
The Msheireb subway station in the heart of Doha has been designed as a major interchange, and features almost 200 m long and 180 m wide imposing structural dimensions.
The project-specific formwork and shoring concept developed by PERI engineers, just-in-time provision of corresponding system equipment as well as continuous on-site support has facilitated cost-effective execution of construction within the tight schedule.
The complex structural geometry as well as massive reinforced concrete components with up to 3 m thick slabs and wall thicknesses up to 2 m required a customized system concept.
Within a very short space of time, PERI Qatar delivered 10,000 m² of wall and column formwork along with 150,000 m³ shoring to the construction site.
During the single-sided forming of the up to 9.50 m high walls with the VARIO Girder Wall Formwork, the fresh concrete pressure is reliably transferred to the sub-structure by means of SB Brace Frames.
The Msheireb subway station in the heart of Doha has been designed as a major interchange, and features almost 200 m long and 180 m wide imposing structural dimensions.
The project-specific formwork and shoring concept developed by PERI engineers, just-in-time provision of corresponding system equipment as well as continuous on-site support has facilitated cost-effective execution of construction within the tight schedule.
The complex structural geometry as well as massive reinforced concrete components with up to 3 m thick slabs and wall thicknesses up to 2 m required a customized system concept.
Within a very short space of time, PERI Qatar delivered 10,000 m² of wall and column formwork along with 150,000 m³ shoring to the construction site.
During the single-sided forming of the up to 9.50 m high walls with the VARIO Girder Wall Formwork, the fresh concrete pressure is reliably transferred to the sub-structure by means of SB Brace Frames.
Project Information
Carlos Allepuz
Construction Manager
PERI engineers have given us full round-the-clock technical support and reliable after sales service from day one. This close cooperation has enabled SOQ JV to use PERI cutting-edge solutions to build this very important station efficiently, safely and successfully.
Are you working on a project like this?
Call us on +974 4411 4816 to discuss your requirements further.