![PERI UP Modular Scaffolding 5 PERI UP Modular Scaffolding 5](https://cdn.peri.cloud/.imaging/mWide/dam/5d0fd9bc-8321-49a1-99cc-568aa559eb3d/64685/peri-up-modular-scaffolding-5.jpg)
PERI UP Modular Scaffolding in action
Your benefits at a glance-
The gravity lock facilitates fast assembly of the modular scaffolding: by inserting the wedge head into the rosette, the wedge drops by force of gravity into the hole and then locks.
-
The rosette on the standard allows for connections up to 45°. The nodes at spacings of 50 cm also provide connection possibilities in all directions.
-
The UDI industrial decking has been designed for high loads: in lengths of up to 200 cm, the permissible load is 10,0 kN/m². With longer lengths, 7.5 kN/m² or 5.0 kN/m² respectively can be carried.
Circular structures can also be easily scaffolded with PERI UP.
-
Maximum adaptability, high level of safety and fast assembly - all this makes PERI UP the ideal system for use in industry.
-
The self-locking ledger connection on the scaffolding node (Gravidty Lock) and the integrated lift lock in the decks can speed up the assembly process.
Product Data Sheet
![PERI UP Modular Scaffolding 2 PERI UP Modular Scaffolding 2](https://cdn.peri.cloud/.imaging/mWide/dam/829c9500-190d-4543-9b79-1e3e75d85d9f/64681/peri-up-modular-scaffolding-2.jpg)
Interested in using PERI UP Modular Scaffolding for your project?
Call us on +974 4411 4816 to discuss your requirements further.
![History II History II](https://cdn.peri.cloud/.imaging/mWide/dam/fe72e0c8-dc6e-4e6a-89e9-39fe83cae531/65472/history-ii.jpg)
Interested in using PERI UP Modular Scaffolding for your project?
Call us on +966 (0) 11 230 0655 to discuss your requirements further.